Construction Project Details
Project Title: (Awarded 10/20) [3110.2053B] CRWS - Effluent Filters Phase IIIB Improvements
Design Firm: Plummer Associates Inc.
Bid Advertisement: 20-Aug
Bid Opening: 20-Oct
Location: CRWS - Treatment Plant
Estimated Construction Cost in Millions: 15 to 20
Description of Work: This project includes the next phase of conversion of sand filters into cloth media filters. Filter Nos. 1 / 2 / 13 / 14 will be converted to cloth media for the additional hydraulic throughput and high effluent quality that result from that media. The remaining sand filters will be decommissioned.
Invitation to Bid: View
Lowest Bidder: View
Bid Award: View


Construction Project Details
Project Title: (Awarded 10/20) [3828.2038] DCRWS - Influent Coarse Screen Improvements
Design Firm: Freese and Nichols Inc.
Bid Advertisement: 20-Aug
Bid Opening: 20-Oct
Location: DCRWS - Treatment Plant
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Installation of coarse screens ahead of fine screens in two channels along with associated electrical and instrumentation. The driveway access for hauling dumpsters will be improved upon as well.
Invitation to Bid: View
Lowest Bidder: View
Bid Award: View


Construction Project Details
Project Title: (Awarded 2/21) [3510.2020] MCRWS - Plant Expansion from 3.0 MGD to 4.5 MGD
Design Firm: Garver LLC
Bid Advertisement: 20-Dec
Bid Opening: 21-Feb
Location: MCRWS - Treatment Plant
Estimated Construction Cost in Millions: 10 to 15
Description of Work: Construction of new blower facility and electrical building. Demolition of existing surface aerators and installation of fixed grid fine bubble diffusers. Construction of diffuser grids and air piping together with electrical / instrumentation / and control enhancements to develop a complete and functional facility. Construction of new primary metering electrical distribution facilities.
Invitation to Bid: View
Lowest Bidder: View
Bid Award: View


Construction Project Details
Project Title: [3110.915] DCURD - Outfall 002 Improvements
Design Firm: Plummer Associates Inc.
Bid Advertisement: 21-Feb
Bid Opening: 21-Apr
Location: CRWS - DCURD
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Relocation of the diversion point for Outfall 002 and installation of a new 30-inch pipeline at the end of the chlorine content basins. Demo and remove equipment in carbon absorption bed and post aeration basin.
Invitation to Bid: View
Lowest Bidder: View
Bid Award: Not Available


Construction Project Details
Project Title: [3110.619] CRWS - West Pond Modifications
Design Firm: Cobb Fendley & Associates Inc.
Bid Advertisement: 21-Mar
Bid Opening: 21-Apr
Location: CRWS - Treatment Plant
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Fill Operations - fill placement and compaction / site grading.
Invitation to Bid: View
Lowest Bidder: View
Bid Award: Not Available


Construction Project Details
Project Title: [3173.400] CRWS - Mountain Creek Interceptor Rehab Segment 30MC-1
Design Firm: Carollo Engineers
Bid Advertisement: 21-May
Bid Opening: 21-Jun
Location: CRWS - Mountain Creek - Grand Prairie/Dallas
Estimated Construction Cost in Millions: 10 to 15
Description of Work: Installation of 7000 LF of 90-inch gravity relief interceptor to replace existing 54- and 78-inch diameter unlined reinforced concrete pipelines that are in poor condition due to corrosion. The new pipeline is to be installed in the same alignment as the existing 54-inch interceptor.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3828.2047] DCRWS - Air Release Valve Replacement Phase 1
Design Firm: Plummer Associates Inc.
Bid Advertisement: 21-May
Bid Opening: 21-Jun
Location: DCRWS - DC Pressure System
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Replacement of four air release valves in very poor condition located along the Denton Creek Pressure System Force Main as identified in the 2015 DCRWS Corrosion Management Plan. The project also includes odor control considerations at one of the air release valve locations.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3828.645] DCRWS - 25HC-4 / 25HC-5 Henrietta Creek Relief Interceptor
Design Firm: Teague Nall & Perkins Inc
Bid Advertisement: 21-May
Bid Opening: 21-Jun
Location: DCRWS - Fort Worth - Haslet
Estimated Construction Cost in Millions: 10 to 15
Description of Work: Installation of approximately 12850 LF of 36- to 48-inch diameter gravity pipeline and the replacement of Meter Station 10_0HC. Meter Station Haslet (MS_HAS) is to be designed by others and incorporated into the Authority's construction of 25HC-4/25HC-5 per Interlocal Agreement with the City of Haslet.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3826.2030] ROCRWS - Red Oak Creek Relief Interceptor Segment 40RO-3
Design Firm: TRA - PDCA
Bid Advertisement: 21-May
Bid Opening: 21-Jun
Location: ROCRWS - Red Oak
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Construction of 1640 LF of 18-inch parallel relief interceptor to replace an existing 10-inch PVC pipe.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3110.2130] CRWS - Bear Creek Interceptor Relief Phase 1 (Downstream)
Design Firm: Lockwood Andrews & Newnam Inc.
Bid Advertisement: 21-Jul
Bid Opening: 21-Aug
Location: CRWS - Grand Prairie
Estimated Construction Cost in Millions: over 25
Description of Work: Replacement of parallel 54- and 84-inch unlined reinforced concrete pipe with a single non-corrosive interceptor along Bear Creek from Hunter Ferrell Road to IH-30. Phase 1 includes 8840 LF of 84- to 96-inch interceptor / four siphons / and replacement of meter stations MS1_0B and MS2_0B. The Bear Creek Interceptor converges with the West Fork Interceptor at the downstream limits of Phase 1 improvements. The project limits were amended to include 5000 LF of 110-inch realignment of the West Fork Interceptor Segment WF-G following an emergency repair of the pipeline due to slope embankment failure in March 2020.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3110.2046C] CRWS - Bear Creek Interceptor Segment 09BC-1 - Phase 2
Design Firm: Plummer Associates Inc.
Bid Advertisement: 21-Jul
Bid Opening: 21-Aug
Location: CRWS - Grapevine
Estimated Construction Cost in Millions: 5 to 10
Description of Work: Installation of 8900 LF of 48-inch relief pipeline. Phase 2 is the most upstream of segment of the 09BC-1 interceptor.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3828.644] DCRWS - 25HC-3 Henrietta Creek Relief Interceptor
Design Firm: Carollo Engineers
Bid Advertisement: 21-Jul
Bid Opening: 21-Aug
Location: DCRWS - Fort Worth
Estimated Construction Cost in Millions: 10 to 15
Description of Work: Installation of approximately 12900 LF of 48- to 54-inch diameter gravity pipeline to relieve the existing 24-inch interceptor. Improvements also include a major highway crossing at IH-35W and the elimination of existing aerial crossings by lowering the profile of the system.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3826.2009A] ROCRWS - Red Oak Creek Interceptor Rehabilitation Segment 40RO-1 Phase 2
Design Firm: Jacobs
Bid Advertisement: 21-Jul
Bid Opening: 21-Aug
Location: ROCRWS - Red Oak
Estimated Construction Cost in Millions: 5 to 10
Description of Work: Installation of approximately 6070 LF of 48-inch diameter gravity relief interceptor to replace the existing 27- to 30-inch unlined reinforced concrete pipeline (RCP) and the replacement of meter station MSRO2_0.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [7002.2059A] TCWSP - Glade Road and Colleyville West Booster Pump Station Arc Flash Mitigation
Design Firm: Gupta Associates Inc.
Bid Advertisement: 21-Jul
Bid Opening: 21-Aug
Location: TCWSP
Estimated Construction Cost in Millions: 0 to 1
Description of Work: Glade Road Booster Pump Station will be reoriented for proper connections. Colleyville West Booster Pump station will take primary service from Oncor. This will involve the construction of new duct bank / new switchgear/ and new transformer. This work will lower the Arc Flash incident energy at these locations.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3210.2090] TMCRWS - Effluent Outfall Relocation
Design Firm: Halff Associates Inc
Bid Advertisement: 21-Jul
Bid Opening: 21-Aug
Location: TMCRWS - Lancaster - Cedar Hill
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Relocation of the TMCRWS effluent outfall structure to approximately 600 LF downstream of current location in Ten Mile Creek. Scope also includes support services to acquire an amendment to the discharge permit for the relocation of the outfall.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3210.681A] TMCRWS - TM-1 Relief Interceptor Phase I
Design Firm: HDR Engineering Inc.
Bid Advertisement: 21-Jul
Bid Opening: 21-Aug
Location: TMCRWS - Lancaster - Cedar Hill
Estimated Construction Cost in Millions: 15 to 20
Description of Work: Improvements include 5000 LF of 72-inch interceptor along Ten Mile Creek in Lancaster from Riverway Drive to Blue Grove Road.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3510.2026] MCRWS - Soap Creek Interceptor Extension
Design Firm: Teague Nall & Perkins Inc
Bid Advertisement: 21-Sep
Bid Opening: 21-Oct
Location: MCRWS - Midlothian
Estimated Construction Cost in Millions: 5 to 10
Description of Work: Installation of approximately 22000 LF of 24- to 30-inch gravity interceptor following Soap Creek from existing MCRWS Railport Lift Station at US-67 to the South Sector system at US-287. This gravity interceptor will replace the existing lift station and force main that currently serves the Railport basin. Decommissioning of the existing Railport Lift Station and Force Main are included in this project.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3826.2008] ROCRWS - Red Oak Creek Interceptor Rehabilitation Segment 40RO-2
Design Firm: (RFP)
Bid Advertisement: 21-Sep
Bid Opening: 21-Oct
Location: ROCRWS - Red Oak
Estimated Construction Cost in Millions: 15 to 20
Description of Work: Installation of a new gravity relief interceptor to replace 9765 LF of 27-inch unlined reinforced concrete pipe or vitrified clay pipe. The preliminary design report completed in 2018 identified several segments that have an expected remaining useful life of less than five years due to corrosion. The existing pipe is also undersized and unable to convey the projected wastewater flows.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3826.906] ROCRWS - Red Oak Creek Relief Interceptor Segment RO-3
Design Firm: Dunaway Associates LP
Bid Advertisement: 21-Sep
Bid Opening: 21-Oct
Location: ROCRWS - Red Oak
Estimated Construction Cost in Millions: 5 to 10
Description of Work: Installation of approximately 8720 LF of 27- to 30-inch gravity relief interceptor to replace an 18- to 21-inch unlined reinforced concrete pipe interceptor. The existing pipe is undersized for the projected wastewater flows. RO-3 is a commitment in the Sanitary Sewer Overflow Initiative Agreement with TCEQ.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3826.2016] ROCRWS - Red Oak Creek Peak Flow Storage & Berm Improvements
Design Firm: Freese and Nichols Inc.
Bid Advertisement: 21-Sep
Bid Opening: 21-Oct
Location: ROCRWS - Red Oak
Estimated Construction Cost in Millions: 10 to 15
Description of Work: Addition of a 7.0 MG peak wet weather storage facility to handle increasing peak flows to the plant. Facilities include the above ground storage tank pump station piping odor control and electrical/instrumentation systems.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3210.2066C] TMCRWS - Plant Rehabilitation A
Design Firm: AECOM Technology Corp
Bid Advertisement: 21-Sep
Bid Opening: 21-Oct
Location: TMCRWS - Lancaster - Cedar Hill
Estimated Construction Cost in Millions: 10 to 15
Description of Work: Installation of cranes at Return Activated Sludge Pump Station No. 1 along with isolation valve and check valve replacements on the influent and discharge side of the pumps / lighting improvements to the west part of the plant / replacement of the mechanism of Primary Clarifier No. 1 / gate replacement at Division Box 2 and 2A / planting of cedar trees along southern and western property lines / replacement of the roof and lighting at the Maintenance Building / addition of a wind screen and cover at Grit 3 / replacement of actuators at the Screening Facility / replacement of perforated fine screen panels on Screen 1 and 2 chains and debris rakes / update the Arc flash SKM model / and assess the air quality in the Sludge Dewatering Facility. The improvements will include rehabilitation of the Foul Air Collection System including the Bioscrubbers and installation of exhaust fans in the process area.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3110.2014] CRWS - Meter Station Rehab Group 1 - MS 3_0M and 16MC-SIPH
Design Firm: Kimley-Horn and Associates Inc.
Bid Advertisement: 21-Nov
Bid Opening: 21-Dec
Location: CRWS - Dallas - Euless - Carrollton
Estimated Construction Cost in Millions: 5 to 10
Description of Work: Replacement of compound meter station MS 3_0M. This project also includes the capacity improvement of the siphon (16MC-SIPH) downstream of MS 3_0M.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3110.3063] CRWS - Feed 2 and JB-1C Improvements
Design Firm: HDR Engineering Inc.
Bid Advertisement: 21-Nov
Bid Opening: 21-Dec
Location: CRWS - Grand Prairie
Estimated Construction Cost in Millions: 20 to 25
Description of Work: Installation of approximately 3700 LF of 96-inch gravity relief interceptor as well as a connection to the downstream limits of the 30MC-1 project. The project provides capacity relief to the WF-1 interceptor by conveying all Mountain Creek Interceptor System flows to the plant through Junction Box JB-1C.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3110.2159] CRWS - Meter Station 1_1E
Design Firm: AECOM Technology Corp
Bid Advertisement: 21-Nov
Bid Opening: 21-Dec
Location: CRWS - Irving
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Replacement of MS1_1E and approximately 200 LF of 42-inch gravity pipeline to tie into existing 104-inch pipe.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3210.2051A] TMCRWS - 11-40TM-2 Phase 1
Design Firm: Teague Nall & Perkins Inc
Bid Advertisement: 21-Nov
Bid Opening: 21-Dec
Location: TMCRWS - Lancaster - Cedar Hill
Estimated Construction Cost in Millions: 10 to 15
Description of Work: This project consists of approximately 17650 LF of 45- to 72-inch diameter gravity parallel relief interceptor. The project also includes the replacement of the Lancaster Meter Station (MS_LAN). This project is the downstream segment of the overall project.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3410.2002] Walker-Calloway Phase 2
Design Firm: RJN Group Inc
Bid Advertisement: 21-Nov
Bid Opening: 21-Dec
Location: W-C - Fort Worth - Hurst
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Rehabilitation of 1986 linear feet of existing 42-inch pipeline.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3410.2003] Walker-Calloway Phase 3
Design Firm: RJN Group Inc
Bid Advertisement: 21-Nov
Bid Opening: 21-Dec
Location: W-C - Fort Worth - Hurst
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Rehabilitation of 3100 LF of existing 27- and 33-inch unlined reinforced concrete pipeline (RCP) along Walker Branch and Calloway Branch at the convergence of the two interceptor systems. The Calloway Branch segment includes 3000 LF of 27-inch pipe beginning at the upstream end of Phase 2 north of Hurst Boulevard and continues along Calloway Branch to Fanning Drive. The Walker Branch segment includes 100 LF of 30-inch unlined RCP along SH 10.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3828.2022] DCRWS - Denton Creek Pressure System Lift Station / Force Main Improvements
Design Firm: Garver LLC
Bid Advertisement: 22-Jan
Bid Opening: 22-Feb
Location: DCRWS - Southlake and Westlake
Estimated Construction Cost in Millions: 5 to 10
Description of Work: Replacement of approximately 11000 LF of existing 20-inch force main with additional force main capacity to convey future peak flows. It also includes additional pumping capacity improvements at the Kirkwood Lift Station (LS_1D).
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3510.2018A] MCRWS - Plant Expansion from 4.5 MGD to 6.0 MGD
Design Firm: Garver LLC
Bid Advertisement: 22-Jan
Bid Opening: 22-Feb
Location: MCRWS - Treatment Plant
Estimated Construction Cost in Millions: 35 to 40
Description of Work: Implement improvements needed to achieve a 6.0 MGD capacity. This includes expanding the influent lift station capacity / adding another drum screen / Return Activated Sludge pump expansion / an additional filter / UV disinfection replacement / dewatering improvements / sitework / more extensive fencing for the plant property / and electrical and instrumentation improvements.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [7002.2003] TCWSP - Filter Rehabilitation and Disinfection Improvements
Design Firm: Hazen and Sawyer DPC
Bid Advertisement: 22-Jan
Bid Opening: 22-Feb
Location: TCWSP - Treatment Plant
Estimated Construction Cost in Millions: 15 to 20
Description of Work: Project includes replacement of the media and underdrains for 24 existing filters / filter valves and actuators / filter hydraulic study / and recommended filter improvements. The addition of a free chlorine contact basin that would include an ammonia and fluoride mixing chamber to prevent uneven distribution of ammonia and fluoride to the clearwells. Additional chemical trenches will be added near the bulk chemical storage areas.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3828.2015] DCRWS - Odor Control Improvements Phase 3
Design Firm: Plummer Associates Inc.
Bid Advertisement: 22-Mar
Bid Opening: 22-Apr
Location: DCRWS - Treatment Plant
Estimated Construction Cost in Millions: 1 to 5
Description of Work: Improvements needed to treat foul air from Aeration Basin Nos. 1 / 2 / 3 and the influent channel. Install a redundant foul air blower for the existing bioscrubber.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available


Construction Project Details
Project Title: [3210.681B] TMCRWS - TM-1 Relief Interceptor Phase II
Design Firm: HDR Engineering Inc.
Bid Advertisement: 22-Sep
Bid Opening: 22-Oct
Location: TMCRWS - Lancaster Cedar Hill
Estimated Construction Cost in Millions: 20-25
Description of Work: Installation of approximately 4650 LF of 72-inch diameter gravity relief interceptor. Improvements also include the replacement of DeSoto meter station (MS_DES) and a 2200 LF tunnel across IH-35E.
Invitation to Bid: Not Available
Lowest Bidder: Not Available
Bid Award: Not Available