Project Title   : [3136.113] Elm Fork North Interceptor Rehabilitation
Design Firm   : RJN Group Inc
Bid Advertisement   : May-20
Bid Opening   : Jun-20
Location   : CRWS - Coppell and Carrollton
Estimated Construction Cost in Millions   : 15 to 20
Description of Work   : Improvements include a combination of rehabilitation/ replacement/ and abandonment of approximately 7950 linear feet (LF) of 33- to 66-inch concrete sewer pipeline including the replacement of MS18_0E.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3173.400] Mountain Creek Interceptor Rehab Segment 30MC-1
Design Firm   : Carollo Engineers
Bid Advertisement   : May-20
Bid Opening   : Jun-20
Location   : CRWS - Grand Prairie and Dallas
Estimated Construction Cost in Millions   : 10 to 15
Description of Work   : This project includes 7000 linear feet of 90-inch gravity relief interceptor to replace existing 54- and 78-inch diameter unlined reinforced concrete pipelines that are in poor condition due to corrosion. The new pipeline is to be installed in the same alignment as the existing 54-inch interceptor.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3110.2132] Rahabilitation
Design Firm   : Halff Associates Inc
Bid Advertisement   : Sep-20
Bid Opening   : Oct-20
Location   : CRWS - CRWS Treatment Plant
Estimated Construction Cost in Millions   : 15 to 20
Description of Work   : Improvements to the levee around storm water pond.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3110.2046C] 09BC-1 - Phase 2
Design Firm   : Plummer Associates Inc
Bid Advertisement   : May-20
Bid Opening   : Jun-20
Location   : CRWS - Grapevine
Estimated Construction Cost in Millions   : 10 to 15
Description of Work   : Installation of 8900 LF of 48-inch relief pipeline. Phase 2 is the most upstream of segment of the 09BC-1 interceptor.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3110.2053B] Effluent Filters Phase IIIB Improvements
Design Firm   : Plummer Associates Inc
Bid Advertisement   : Jul-20
Bid Opening   : Aug-20
Location   : CRWS - CRWS Treatment Plant
Estimated Construction Cost in Millions   : 15 to 20
Description of Work   : This project includes the next phase of conversion of sand filters into cloth media filters. Filters 1/ 2/ 13/ and 14 will be converted to cloth media for the additional hydraulic throughput and high effluent quality that result from that media. The remaining sand filters will be decommissioned.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3110.2014] Meter Station Rehab Group 1 (15_0E 3_0M & 16MC-SIPH 10_0B)
Design Firm   : Kimley-Horn and Associates Inc
Bid Advertisement   : Nov-20
Bid Opening   : Dec-20
Location   : CRWS - Dallas/ Euless/ Carrollton
Estimated Construction Cost in Millions   : 5 to 10
Description of Work   : Replace compound meter stations MS 15_0E/ MS 3_0M/ and MS 10_0B. This project also includes the replacement of the siphon (16MC-SIPH) downstream of MS 3_0M.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3110.2161] Headworks A Fine Screen Facility
Design Firm   : Garver LLC
Bid Advertisement   : Feb-20
Bid Opening   : Apr-20
Location   : CRWS - CRWS Treatment Plant
Estimated Construction Cost in Millions   : More than 25
Description of Work   : Not Available
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3145.200A] Junction Box-1C Rehabilitation
Design Firm   : Not Available
Bid Advertisement   : Mar-20
Bid Opening   : Apr-20
Location   : CRWS -
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : Rehabilitation of existing junction box 1-C on the West Fork Interceptor where the existing 110-inch pipeline transitions to a multi-pipe system as it enters the CRWS treatment plant. Improvements include installation of isolation gates/ corrosion protection/ odor control/ improved access/ and SCADA system upgrades.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3828.644] 25HC-3 Henrietta Creek Relief Interceptor
Design Firm   : Carollo Engineers
Bid Advertisement   : Jul-20
Bid Opening   : Aug-20
Location   : DCRWS - Fort Worth
Estimated Construction Cost in Millions   : 10 to 15
Description of Work   : This project consists of approximately 12900 LF of 48- to 54-inch diameter gravity pipeline to relieve the existing 24-inch interceptor. Improvements also include a major highway crossing at IH-35W and the elimination of existing aerial crossings by lowering the profile of the system.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3828.645] 25HC-4 / 25HC-5 Henrietta Creek Relief Interceptor
Design Firm   : Teague Nall & Perkins Inc
Bid Advertisement   : Jul-21
Bid Opening   : Aug-21
Location   : DCRWS - Fort Worth/Haslet
Estimated Construction Cost in Millions   : 10 to 15
Description of Work   : This project consists of approximately 12850 LF of 36- to 48-inch diameter gravity pipeline and the replacement of Meter Station 10_0HC. Meter Station Haslet (MS_HAS) is to be designed by others and incorporated into the Authority's construction of 25HC-4/25HC-5 per Interlocal Agreement with the City of Haslet.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3828.2047] DCRWS ARV Replacement Phase 1
Design Firm   : Alan Plummer Associates Inc
Bid Advertisement   : Mar-20
Bid Opening   : Apr-20
Location   : DCRWS - DCPS Phase III Section 1 & 2
Estimated Construction Cost in Millions   : 0 to 1
Description of Work   : Not Available
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3510.2001B] Peak Flow Storage - MCRWS
Design Firm   : Garver LLC
Bid Advertisement   : Mar-20
Bid Opening   : Apr-20
Location   : MCRWS - Midlothian - MCRWS Treatment Plant
Estimated Construction Cost in Millions   : 5 to 10
Description of Work   : To mitigate sanitary sewer overflows and provide additional capacity ahead of the impending expansion of the plant the peak flow basin will provide more immediate relief for the plant during wet weather events. Preliminary design of a new headworks is also included to accommodate future expansions of the plant.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3826.2008] Red Oak Creek Interceptor Rehabilitation Segment 40RO-2
Design Firm   : Not Available
Bid Advertisement   : May-21
Bid Opening   : Jun-21
Location   : ROCRWS - Red Oak
Estimated Construction Cost in Millions   : 15 to 20
Description of Work   : This project consists of a new gravity relief interceptor to replace 9765 LF of 27-inch unlined reinforced concrete pipe interceptor. The existing pipe is undersized and unable to convey the projected wastewater flows.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3826.905] Red Oak Creek Relief Interceptor Segment RO-2
Design Firm   : BW2 Engineers Inc
Bid Advertisement   : Mar-20
Bid Opening   : Apr-20
Location   : ROCRWS - Cities of Oak Leaf/Ovilla/Ellis County
Estimated Construction Cost in Millions   : 5 to 10
Description of Work   : This project includes approximately 5800 LF of 30- to 36-inch diameter gravity relief interceptor. The project also includes the replacement of meter station MS-OV1. The new pipeline will serve as a relief interceptor for the existing 18- and 21-inch diameter gravity sewer.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3826.907] Red Oak Creek Relief Interceptor Segment RO-4
Design Firm   : Not Available
Bid Advertisement   : May-24
Bid Opening   : Jun-24
Location   : ROCRWS - Cedar Hill
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : This project consists of a new gravity relief interceptor to replace 5702 LF of 18-inch unlined reinforced concrete pipeline and the replacement of MSCH1_0. The existing pipe is undersized and is unable to convey the projected wastewater flows.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3826.2009A] Red Oak Creek Interceptor Rehabilitation Segment 40RO-1 Phase 2
Design Firm   : CH2M Hill
Bid Advertisement   : May-20
Bid Opening   : Jun-20
Location   : ROCRWS - Red Oak
Estimated Construction Cost in Millions   : 10 to 15
Description of Work   : This project consists of approximately 6815 linear feet (LF) of 48-inch diameter gravity relief interceptor to replace the existing 27-inch unlined reinforced concrete pipeline and the rehabilitation/replacement of meter station MSRO2_0. Segment 40RO-1 project was split into two construction phases. Phase 1 which includes replacement of 760 LF of 27- to 30-inch diameter unlined reinforced concrete pipe was bid for construction with the RBC-1 & RBC-2 Gravity Outfall Project (refer to 3826.2023). This segment was expedited due to the poor conditions and impacts to the operation of the treatment plant. Phase 2 will include the remaining 6055 LF of improvements.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3826.906] Red Oak Creek Relief Interceptor Segment RO-3
Design Firm   : Dunaway Associates LP
Bid Advertisement   : Jan-21
Bid Opening   : Feb-21
Location   : ROCRWS - Red Oak
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : This project consists of approximately 8720 LF of 27- to 30-inch gravity relief interceptor to replace an 18- to 21-inch unlined reinforced concrete pipe interceptor. The existing pipe is undersized for the projected wastewater flows. R0-3 is a commitment in the Sanitary Sewer Overflow Initiative Agreement with TCEQ.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [7002.2049] Lake Arlington Raw Water Pump Station Shared Operation Improvements
Design Firm   : Not Available
Bid Advertisement   : Mar-20
Bid Opening   : Apr-20
Location   : TCWSP - Arlington
Estimated Construction Cost in Millions   : 15 to 20
Description of Work   : The City of Arlington and TRA currently operate separate intake/raw water pumping facilities at Lake Arlington. The scope of this interlocal agreement is to investigate the feasibility of shared operations of the Lake Arlington Raw Water Pump Station (LARWPS) currently owned and operated by the City of Arlington. There are multiple piping interconnects between the two systems and it is possible the LARWPS can be configured with pumps that provide the needed capacity for both more cost-effectively than if each entity separately invested in upgrading its own facilities.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [7002.2030B] Treatment Plant Security Improvements
Design Firm   : Not Available
Bid Advertisement   : May-20
Bid Opening   : Jun-20
Location   : TCWSP - TCWSP Treatment Plant
Estimated Construction Cost in Millions   : 0 to 1
Description of Work   : Improvements include a new security Video Management System to connect to new and existing CCTV cameras for a security video monitoring system replacement of two vehicle gates and gate operators and new cameras and keycard readers in multiple locations. A new sector antenna is also to be installed at the City of Bedford Elevated Storage Tank.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [7002.2083] Chlorine Contact Basin and Mixing Chamber
Design Firm   : Hazen and Sawyer KCI Technologies Inc.
Bid Advertisement   : May-20
Bid Opening   : Jun-20
Location   : TCWSP - TCWSP Treatment Plant
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : The addition of a free chlorine contact basin that would include an ammonia and fluoride mixing chamber to prevent uneven distribution of ammonia and fluoride to the clearwells.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3210.2051A] 11-40TM-2 PH 1
Design Firm   : Not Available
Bid Advertisement   : Jul-22
Bid Opening   : Aug-22
Location   : TMCRWS - Lancaster and Ferris
Estimated Construction Cost in Millions   : 10 to 15
Description of Work   : This project consists of approximately 17650 LF. of 45- to 72-inch diameter gravity parallel relief interceptor. The project also includes the replacement of Ferris and Lancaster Meter Stations (MS_LAN). This project is the downstream segment of the overall project.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3210.2076A] Meter Station Rehabilitation (MS_BB MS_CH MS_FER)
Design Firm   : Not Available
Bid Advertisement   : Jul-21
Bid Opening   : Aug-21
Location   : TMCRWS - Cedar Hill and Ferris
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : Replace meter stations MS_BB MS_CH and MS_FER in the Ten Mile Creek Interceptor System.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3210.681A] TM-1 Relief Interceptor Phase I
Design Firm   : Not Available
Bid Advertisement   : Jan-21
Bid Opening   : Feb-21
Location   : TMCRWS - Lancaster and Cedar Hill
Estimated Construction Cost in Millions   : 15 to 20
Description of Work   : TM-1 Phase I improvements include 12350 LF of 72-inch interceptor along Main Street in Lancaster from Belt Line Road to Blue Grove Road.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3210.681B] TM-1 Relief Interceptor Phase II
Design Firm   : Not Available
Bid Advertisement   : Jan-22
Bid Opening   : Feb-22
Location   : TMCRWS - Lancaster and Cedar Hill
Estimated Construction Cost in Millions   : 20 to 25
Description of Work   : This project consists of approximately 4650 LF of 72-inch diameter gravity relief interceptor. Improvements also include the replacement of DeSoto meter station (MS_DES) and a 2200 LF tunnel across Interstate Highway 35E.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3210.2078] Erosion Site Rehabilitation - Ten Mile Creek Channel
Design Firm   : Halff Associates Inc
Bid Advertisement   : Mar-20
Bid Opening   : Apr-20
Location   : TMCRWS - Ferris
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : Bank stabilization upstream and downstream of the existing 66-inch aerial pipeline crossing at Ten Mile Creek. In addition engineering services required for an amendment to the Texas Pollutant Discharge Elimination System will be performed. The Authority is exploring relocation of the effluent discharge outfall structure.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3410.2002] Walker-Calloway Phase 2
Design Firm   : RJN Group Inc
Bid Advertisement   : Sep-20
Bid Opening   : Oct-20
Location   : W-C - Fort Worth/ Hurst
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : Phase 2 includes the rehabilitation of 1986 linear feet of existing 42-inch pipeline.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available


Construction Project Details
Project Title   : [3410.2003] Walker-Calloway Phase 3
Design Firm   : RJN Group Inc
Bid Advertisement   : Sep-20
Bid Opening   : Oct-20
Location   : W-C - Fort Worth/ Hurst
Estimated Construction Cost in Millions   : 1 to 5
Description of Work   : Phase 3 includes the rehabilitation of 4500 LF of existing 27- and 30-inch unlined RCP along Walker Branch and Calloway Branch at the convergence of the two interceptor systems. The Calloway Branch segment includes 2300 LF of 27-inch pipe beginning at the upstream end of Phase 2 north of Hurst Boulevard and continues along Calloway Branch to Melbourne Road while the Walker Branch segment includes 1200 LF of 30-inch unlined RCP along State Highway 10.
Invitation to Bid   : Not Available
Lowest Bidder   : Not Available
Bid Award   : Not Available